Stage 03 — supplier evaluation
MOQ and price bands for wooden toys: what moves the number
Why wooden toy MOQs sit where they do, what moves the unit price inside each band, and how to compare two quotations written on different bases.
MOQ and price are not fixed properties of a supplier. They are outputs of the tooling, the material yield, the finishing route and the packing you choose. This page explains the three MOQ bands used across the Yunhe cluster, what moves the unit cost inside each band, and how to compare two quotations that were never written on the same basis.
The three MOQ bands
A first order often stalls on one line: minimum order quantity. It helps to sort the question into three bands before you negotiate, because each band is set by a different cost.
- Stock or ready models: typically 20–100 pcs per style. The cutting programme, the paint colour and the carton already exist. The MOQ protects picking and packing time rather than tooling.
- Custom print, colour or packaging: typically 300–1,000 pcs. A new colour means a paint batch and a cleaning cycle; a printed box or insert means a plate or a digital setup; custom labels mean a separate run.
- New shape or new tooling: typically 1,000–3,000 pcs. A new profile needs cutting files, jigs and often a sample round, and the tooling cost has to be recovered across the run.
Repeat orders can run below the band when the tooling and the process already exist. That is the one exception worth asking for explicitly: does the MOQ fall on the second order, and to what number? Get the answer before you plan the first order, because it changes how much stock you carry after the reorder.
| Band | Typical quantity | What sets it | What to fix first |
|---|---|---|---|
| Stock model | 20–100 pcs | picking and packing time | colour and carton already exist |
| Custom print or packaging | 300–1,000 pcs | plate, paint batch, label run | artwork and colour references |
| New shape or tooling | 1,000–3,000 pcs | cutting files, jigs, sample round | drawing and tolerance sheet |
| Repeat order | below band, by agreement | existing tooling | state the rule in the first purchase order |
MOQ is quoted per style, and usually per colour or print. A quote that says "MOQ 500" without saying 500 of what is incomplete. Ask whether it means 500 per style, per colour, per carton print or per mixed order. The answer changes the whole order plan, especially when a buyer wants eight colourways of an open-ended set. For those ranges, the per-colour MOQ is the number that decides the plan; the open-ended and Waldorf category shows how buyers usually split an order across colourways.
What moves the unit cost
Wooden toys are not priced per kilogram. Two quotes for the same stacking-ring design can differ by a wide margin because one is a thinner board with fewer rings and a plain carton, and the other is a heavier board with more rings, a water-based finish, an insert and a printed box. Compare the components, not the headline.
Material and yield come first. Ask for the species, the board thickness and the grade, then ask how the shape is nested on the board. A shape that nests badly wastes material and cutting time, and that waste is priced into the unit whether or not the supplier names it.
Labour and finish come next. Sanding passes, edge radius, the number of paint colours, masking, assembly jigs, hardware fitting and packing all sit in the unit price. The finishing route matters as much: an in-house paint line with drying racks has a different cost profile from a subcontracted booth that has to be booked and transported to.
Packing and freight are part of the same number. Carton print, inserts, polybags, carton size and carton weight change both the packing cost and the freight cost, and a slightly larger carton can move a container plan. A quote that treats packaging as an afterthought is not a landed quote.
| Cost driver | What you control | What to ask |
|---|---|---|
| Species and thickness | board spec on the drawing | which grade, and what the next grade up costs |
| Cutting yield | the shape and its nesting | how many pieces per board, and who optimises the layout |
| Sanding and edge work | radius and finish standard | how many grits, and whether edges are hand-finished |
| Paint | colours and system | number of colours, masking, and the cure schedule |
| Hardware | fittings and assembly | whether hardware is included and who fits it |
| Packing | box, insert, polybag, carton | what "standard packaging" actually contains |
Read the quotation as a structure
A unit price is one line of a structure. Ask for the structure in writing and make the supplier state the basis for each line. A quotation with one number and one sentence is a starting point, not a comparison document.
The lines to demand are:
- the unit price at your MOQ;
- the unit price at two higher volumes;
- the tooling fee for a new shape, and who owns the tooling;
- the sample fee and its refund rule;
- packaging cost, and what standard packaging includes;
- carton dimensions, pieces per carton and gross weight;
- the Incoterm and the loading port;
- the lead time from deposit and from sample sign-off;
- the payment structure, and how long the quote is valid.
Normalise before you compare. Bring both quotes to the same Incoterm, the same packaging standard, the same payment terms and the same inspection arrangement. A DDP price set against an FOB price is not a comparison; it hides freight, duty and the forwarder's margin in one number you cannot check.
Price bands behave in a predictable way. A custom print or packaging run typically carries a higher unit price at the bottom of its band, and the price flattens as volume approaches the top of the band. A new shape adds tooling that is often quoted separately but sometimes absorbed into the unit price; ask which, because absorbed tooling usually means you pay for it again on a reorder at low volume.
What good looks like
The table turns the bands and the cost drivers into answers you can compare across suppliers. The weak answers are the ones that leave the price undecided.
| Item | Weak answer | Strong answer |
|---|---|---|
| MOQ statement | "MOQ 500" | "500 pcs per style and per colour, 300 pcs on repeat" |
| MOQ basis | unclear whether per style or per order | written per style and per colour or print |
| Price breaks | one price, take it or leave it | prices at MOQ and at two higher volumes |
| Tooling and sample fees | "included" with no detail | separate lines with a refund or deduction rule |
| Quote validity | "today only" | a stated validity period and a price-change trigger |
| Carton data | "to be confirmed" | measured dimensions, pieces and gross weight per carton |
| Incoterm | unstated | FOB Ningbo or Shanghai, or the alternative named |
| Packaging | "standard" | a defined box, insert, polybag and carton specification |
Score the quote on how many of these lines are specific. Two vague lines are normal on a first quote; five vague lines mean the supplier is quoting before understanding the order.
Red flags in a quotation
- The MOQ is quoted with no colour or print qualifier.
- The quote is valid only "today", with pressure to confirm immediately.
- No tooling or sample fee appears anywhere in writing.
- The price break only appears at five or ten times your planned order.
- Carton data is left "to be confirmed" after the spec is fixed.
- "Standard packaging" is never defined.
- Free design or free artwork is offered without a scope or a revision limit.
- A discount appears before the specification is agreed.
- The supplier will not re-quote the same model at a second volume.
Run it in this order
- Fix the spec sheet before you ask for a price: model, size and tolerance, species and thickness, finish, colour references, packing and age grade.
- Ask for the MOQ per style and per colour or print, in writing.
- Ask for the unit price at MOQ and at two higher volumes.
- Ask for tooling, sample and packaging costs as separate lines, with the refund or deduction rule.
- Normalise competing quotes to one Incoterm, one packaging standard and one payment structure.
- Check carton data and lead time against the shipping plan before comparing totals.
- Put quote validity, price-break triggers and tooling ownership into the purchase order.
- Re-quote the same model after the first production run, when the real band becomes visible.
Where this fits
The number on a quotation is a structure, not an opinion, and the structure is easier to read when you ask for each line. The full breakdown is in the price structure of a wooden toy, and the supplier evaluation hub places the price question alongside the audit and sample checks. When the spec and the volume are settled, request a quotation with both stated, so the supplier prices the same order you are planning.
Use the stage with its guide: Wooden toy supplier evaluation checklist (58 points).