Wooden Toys Supplier

Guide · 11 min read

Wooden toy supplier evaluation checklist (58 points)

A copy-ready 58-point wooden toy supplier checklist in eight stages, from documents and factory audit to pricing, packing, inspection and payment terms.

This checklist is for the buyer who has two or three candidate workshops and needs a scored, defensible reason to choose one. Run it between first contact and first deposit: once on the desk, once on the audit call or site visit, and again after samples arrive. The output is a score out of 116, a list of unresolved stops and a corrective-action list you can send back to the supplier.

The 58 points are grouped into the eight stages of a sourcing cycle and written as checks, not questions. Copy the tables into a spreadsheet, one row per point, and add three columns: score, evidence file name and corrective action.

How the score works

Score every point from 0 to 2. Zero means no evidence; 1 means a partial or verbal answer; 2 means a document, photograph or measurement has been seen and matches the other records. The maximum is 116.

Three stages carry stop rules. A single zero in Documents or Terms ends the evaluation whatever the total, and a zero in Packing or Inspection holds the order until it is closed in writing. A second rule matters as much: no stage may score below 60% of its own maximum. A supplier that is strong on price and weak on documents is not a 70% supplier; it is a supplier that will cost you a shipment.

TotalReadingNext step
95–116ProceedSample sign-off and a written inspection plan; keep the file as the baseline for the next order.
75–94ConditionalConvert every 1 and 0 into a dated corrective action; no deposit until zeros in stages 1, 5 and 8 are closed.
Below 75StopRe-quote with another workshop or reduce scope to a stock model with lower tooling risk.

The 58-point checklist

Each stage carries its point numbers. Request the evidence in the right-hand column before the call; the conversation is for points a photograph cannot settle.

Stage 1 — Documents (points 1–8)

Documents establish who you are contracting with. A trading company can be a good partner, but it must be visible as one, and its registered address will not match the workshop gate.

What to checkEvidence and pass condition
1Business licence: legal name, registered address, scope includes toys
2Customs registration or foreign trade operator record
3Invoicing entity
4Product liability insurance
5Test report set: standards, applicant, models covered
6Social or management audit, if claimed
7FSC chain-of-custody claim, if your market needs it
8Bank account name

Stage 2 — Facility audit (points 9–15)

The audit is a walk through the building, live or on video, not a presentation. Ask for the route in advance and score only what you can see.

What to checkEvidence and pass condition
9Workshop address matches licence and customs records
10Processes done in-house versus subcontracted
11Machine list and condition
12Board drying and storage
13Paint system and cure schedule
14Workforce and lines
15Housekeeping and scrap handling

Stage 3 — Capability (points 16–22)

Capability answers one question: can this workshop make your item, at your volume, in the month you need it? Sales copy describes categories; capacity is per model.

What to checkEvidence and pass condition
16Monthly capacity per category or model
17Peak-season capacity, August to November
18New-shape and tooling capability
19Finishing range: colours, print methods, masking
20Assembly and packing capacity
21Quality staffing and reporting line
22Reliance on other workshops for parts

Stage 4 — Samples (points 23–29)

A sample is a contract in physical form. Every point below ends with a signed, dated object kept by both sides.

What to checkEvidence and pass condition
23Sample fee and refund rule in writing
24Sample lead time by type
25Signed spec sheet
26Colour and finish match
27Functional and safety check record
28Packaging mock-up
29Counter-samples and retention

Stage 5 — Pricing and MOQ (points 30–36)

Price is the last thing to compare, not the first. Confirm what the number includes before comparing two numbers.

What to checkEvidence and pass condition
30MOQ by style, colour and print
31Price validity and re-quote triggers
32Cost build-up: material, labour, finish, packing
33Tooling cost and ownership
34Incoterm and named port
35Test report cost and responsibility
36Payment terms and their cost

Stage 6 — Packing (points 37–43)

Packing data is not clerical. Wrong carton dimensions change the container plan, the freight cost and the damage rate.

What to checkEvidence and pass condition
37Carton dimensions and gross weight
38Pieces per carton and inner packing
39Carton strength
40Shipping marks, labels and age marking
41Pallet plan and ISPM 15
42Carton count and CBM reconciliation
43Moisture protection for sea freight

Stage 7 — Inspection (points 44–51)

The inspection is planned before the order starts. Writing the plan afterwards turns every defect into a negotiation.

What to checkEvidence and pass condition
44AQL plan agreed in writing
45Inspection timing
46Inspector access and random sampling
47Defect classification sheet
48Report format
49Rework and re-inspection rule
50Pre-production sample and golden sample
51Loading check

Stage 8 — Terms (points 52–58)

The terms stage converts a good relationship into an enforceable one. Keep it short, written and signed before the deposit.

What to checkEvidence and pass condition
52Payment milestones
53Bank detail verification
54Contract or PO clauses
55Lead time and peak or New Year clause
56Late delivery and defect claims
57Tooling and design ownership
58Exit and handover

Running it in three weeks

  1. Days 1–3: documents only. Send points 1–8 as a request list with a deadline. Do not book a call until the licence, report set and bank name are in hand.
  2. Days 4–5: desk score. Match the licence address to the workshop, read the report register and compare the quote with the MOQ rules. Score stages 1, 5 and 8.
  3. Week 2: audit call or visit. Use the 42 factory-audit questions, then score stages 2, 3 and 6 against what you saw.
  4. Week 2–3: sample round. Order against the spec sheet, score stage 4 when the sample arrives and keep the counter-sample sealed.
  5. Week 3: inspection plan. Agree stage 7 in writing. You are not inspecting yet; you are testing whether the supplier accepts a method.
  6. Before deposit: re-score. Close or date every zero in stages 1, 5 and 8. The re-score is also your first measure of how the supplier handles correction.

How to use this with a supplier

The method behind these points is set out in the supplier evaluation section, and the question-by-question companion is the 42-question factory audit list. When you are ready to move from scoring to a first order, use the quote request and attach the completed sheet; it makes the first reply more useful on both sides.

Matching stage: supplier evaluation. When the specification is fixed, request a quote.