Wooden Toys Supplier

Guide · 9 min read

The price structure of a wooden toy: material, labour, paint, packing

What sits inside a wooden toy quotation, the six factors that move the unit price, and a template for asking suppliers for a cost build-up you can compare.

This guide is for the buyer who has two or three quotations for the same wooden toy and needs to know why the numbers differ before negotiating. It is used after the spec sheet exists and before the supplier is chosen, when the difference between quotes is often not price at all but what each price includes. The output is a normalised comparison: every quote reduced to the same scope, same Incoterm, same packing and same payment terms, so the remaining gap is the real commercial difference.

Nothing in this guide quotes a price. What it gives you is the structure of a quotation, the questions that expose its assumptions, and an index method for comparing two totals that are built on different scopes.

What a wooden toy quote is made of

A unit price is a stack of cost lines, and each line can be moved by a different decision. The table below is the stack in the order a workshop usually builds it.

Cost lineWhat it coversWhat to ask and check
MaterialBoard by species and thickness, yield from the board, offcuts and defectsWhich species, which thickness, and how the board is cut to limit waste.
MachiningLaser or CNC cutting, drilling, edge shaping and programming timeWhether programming is charged once or per order, and who owns the cut files.
Sanding and assemblyLabour for edge sanding, joint fitting and glue-upHow much sanding is done by hand, and what the reject rate is at assembly.
FinishingPaint or stain, number of colours, coats, masking, curing and reworkPaint system, colour count, masking method and whether finishing is in-house.
Hardware and componentsHinges, screws, magnets, rope, fabric, printed paper or stickersSource of bought-in parts and whether they were included in the test report.
PackingInner box, polybag, divider, carton, printing and palletCarton dimensions, print coverage, pallet standard and who supplies artwork.
ToolingJigs, screens, print plates, dies and first-article timeOne-off or amortised, ownership, and what happens if the order is not placed.
Testing and documentsTest reports per model and market, inspection, certificates of originWho commissions, who pays and whether the cost is per model or per market.
Freight and termsInland haulage, export clearance, port handling, Incoterm and payment termsWhich port, which Incoterm, and what the payment structure costs the supplier.
MarginThe workshop's and any trading company's marginWhether one or two margins sit in the price, and who is accountable for quality.

The split between these lines moves with volume, complexity and how much is subcontracted. Do not read a percentage from one quotation as a rule for the next product: a large simple item at high volume can be dominated by material, while a small multi-colour item at low volume can be dominated by finishing and packing.

The six things that move the number

  1. Species and board thickness. A denser or thicker board costs more per piece and cuts differently. Ask which species and thickness are assumed, because a quote built on a thinner board is not the same product.
  2. Yield from the board. The same shape nested differently on a board can change material use noticeably. Laser nesting and offcut reuse are part of the price, not a detail for the workshop alone.
  3. Colour count and masking. Every extra colour adds paint, a mask or a screen, drying time and a chance of rework. Four colours are not simply two colours twice.
  4. Labour content. Sanding, assembly and inspection are labour, and labour is where a low quote is usually low. Ask how many sanding and finishing steps are done by hand.
  5. Volume and MOQ. Setup time is spread over the order. Crossing an MOQ band changes the unit price because the setup is amortised differently, not because the toy changed.
  6. Packing and terms. A printed inner box, a heavier carton or a different Incoterm can account for a large part of the gap between two quotes before any negotiation starts.

Ask for the build-up

Suppliers rarely share a full cost breakdown, and a buyer who demands one on the first email often gets nothing. Ask for the main lines as percentages or as "included / not included", and state the scope explicitly. A short reply that says what is included is more useful than a detailed sheet that hides assumptions.

``` Subject: Cost build-up request — <model / SKU>, quantity <qty>

For the quotation dated <date>, please confirm:

  1. Wood species and board thickness, and the board price basis
  2. Labour included: cutting, sanding, assembly, packing
  3. Paint system, number of colours and coats, masking method
  4. Packing included: inner box, carton, printing, pallet
  5. Tooling: cost, one-off or amortised, and who owns the jigs and screens
  6. Test reports: which standards and markets are included, and who pays
  7. Incoterm and named port, and what is excluded
  8. Payment terms, and whether the price changes with them
  9. Quote validity and the material or exchange-rate trigger for a re-quote
  10. The MOQ this price assumes, and the price basis below and above it

If a line is not included, please say so rather than leaving it out. ```

Compare quotes on the same basis

Normalise before you compare. The table is the order to work in: scope first, then terms, then volume. Only then does the unit price mean anything.

What to normaliseWhy it changes the comparison
SpecificationSpecies, thickness, dimensions, colour count and hardware must be identical.
PackingInner box, carton, print and pallet change cost and freight volume.
TestingA quote that excludes reports for your market is not the same price.
Incoterm and portFOB Ningbo and FOB Shanghai are different risk and cost points.
VolumeCompare at the same order quantity and the same MOQ band.
Payment termsDeposit, balance and credit terms carry a cost for one side.
Lead timeA faster date can mean overtime, air freight or a different line.

One practical method is to keep a price index rather than a currency figure. Set the first quote you trust at 100, and express every other quote as points against it. Then adjust for scope before comparing:

`` comparable index = quoted index + value of scope the quote excludes − value of scope the quote includes that others do not ± term adjustment (Incoterm, payment, lead time) ``

For example, quote A is 100 and quote B is 112. B includes a printed inner box and four colours that A excludes; when those are priced from A's own add-on list, B becomes 103 on a like-for-like basis. The decision has moved from "B is 12 points dearer" to "B is 3 points dearer with less scope risk". A third quote at 96 that excludes test reports is not cheaper once the reports are added.

A related check is cost per carton and per cubic metre, not only per unit. Two quotes with the same unit price can load differently because of carton size: the load that fills the container earlier carries more freight per piece.

Red flags in a quote

Where to look, and what to negotiate

Cost concentrates differently by product type. Before the second call, look at the two or three lines that dominate the item you are buying, and leave the rest alone.

Product typeLine that usually dominatesWhat to ask about it
Stacking rings, simple cut shapesBoard yield and sanding labourHow the shape is nested on the board and how edges are sanded.
Peg puzzles, flat printed itemsPrint or paint coverage and board flatnessPrint method, board moisture and how piece fit is checked.
Play kitchens, large assembly itemsHardware, assembly labour and carton sizeHardware source, assembly time and measured carton dimensions.
Train sets, many-part itemsPart count, bagging and packing labourParts per set and how the parts are bagged and counted.
Baby rattles, teethersFinish smoothness, paint system and small partsFinish process, report coverage and age grading.

Not every saving needs to come out of the toy. These levers change the commercial terms without changing what the customer receives:

  1. Change the packing, not the product. A simpler inner print or a smaller carton can remove cost and cubic metres at the same time.
  2. Move one MOQ band. Ordering at the top of a band can spread the setup better than a small top-up at the bottom of the next one.
  3. Accept a longer, reliable lead time. A realistic date is cheaper than overtime, and it removes the cost of a rushed inspection.
  4. Combine styles in one container. Consolidation spreads freight and inspection costs across more units; the CBM guide shows how to plan it.
  5. Fix the colour count before sampling. Agreeing four colours and then adding a fifth after the sample is the most common avoidable cost increase.

How to use this with a supplier

The method behind price bands and MOQ is set out in the MOQ and price bands page. Carton size and pallet choices are the next cost lever, covered in the mixed container CBM guide. When the normalised comparison is ready, send the reference models and the comparison sheet with the quote request so both sides work from the same scope.

Matching stage: supplier evaluation. When the specification is fixed, request a quote.