Guide · 9 min read
Writing an AQL inspection plan for a wooden toy order
An ISO 2859-1 AQL table for wooden toys, defect definitions, the checkpoints to inspect, and a copy-ready pre-shipment inspection plan template.
This guide is for the buyer who has placed or is about to place an order and needs the inspection agreed before production, not argued about after it. Use it when the purchase order is written, and again when the inspector is booked, because the plan decides the sample size, the acceptance numbers and what counts as a defect. The output is a one-page inspection plan attached to the PO, a defect list the factory has already seen, and a disposition rule that tells everyone what happens if the lot fails.
Write the plan before the deposit. An inspection agreed at the end is a negotiation with the goods already on the floor.
The terms, in one table
| Term | What it means | What goes in your plan |
|---|---|---|
| Lot | The group of units inspected together | One lot per style, or per production run if quantities are large. |
| Sample size | How many units the inspector checks | Read from the standard table using the lot size and inspection level. |
| AQL | The reference defect level for the plan | Usually 2.5 for major defects and 4.0 for minor defects, with zero acceptance for critical. |
| Ac / Re | Acceptance and rejection numbers | Ac is the highest defect count that accepts the lot; Re rejects it. |
| Inspection level | How much inspection the plan requires | General level II is the common default; level III for a new supplier or a high-risk item. |
| Critical, major, minor | Defect classes counted separately | Define each class in writing with examples before the visit. |
AQL is a percentage, not a target. A plan at AQL 2.5 for major defects accepts a lot whose sample defect rate is at or below that reference level; it does not promise that every unit is perfect. The inspector counts each defect class separately, because a lot can pass on minors and fail on majors.
The AQL table for wooden toys
The extract below is the common starting point: ISO 2859-1, general inspection level II, single sampling, normal inspection (Table 2-A), for lots from 151 to 10,000 pieces. Use it to find the sample size and acceptance numbers, then copy them into the PO.
| Lot size | Code | Sample size | AQL 2.5 Ac/Re | AQL 4.0 Ac/Re |
|---|---|---|---|---|
| 151–280 | G | 32 | 2/3 | 3/4 |
| 281–500 | H | 50 | 3/4 | 5/6 |
| 501–1,200 | J | 80 | 5/6 | 7/8 |
| 1,201–3,200 | K | 125 | 7/8 | 10/11 |
| 3,201–10,000 | L | 200 | 10/11 | 14/15 |
Three rules sit around the table. First, critical defects are commonly planned at zero acceptance: any critical defect in the sample rejects the lot. That is a buyer rule written into the plan, not an AQL column in the standard, so state it explicitly rather than writing "AQL 0". Second, the table is only valid for the inspection level and sampling type named; do not carry a number from one plan to another. Third, confirm the table with the inspector you book, because inspection bodies sometimes use a different edition or a tightened level.
A worked reading: a lot of 2,400 stacking rings falls in the 1,201–3,200 band, giving code K and a sample of 125 pieces. At AQL 2.5 the plan accepts up to 7 major defects and rejects at 8; at AQL 4.0 it accepts up to 10 minor defects and rejects at 11. One critical defect rejects the lot regardless of the minor count. These figures follow from the table; confirm the exact Ac/Re for the edition and inspection level your inspector uses against ISO 2859-1 Table 2-A before the plan is signed.
For a first order, a new supplier or a complex painted item, consider general level III, which increases the sample size and makes the plan stricter. For a stable repeat order with a clean history, level II is usually enough.
The checkpoint list
The AQL table decides how many pieces to check; the checkpoint list decides what to check on each one. Adapt the list to the product, but keep the classes and the order fixed.
| # | Checkpoint | What the inspector does | Typical class if it fails |
|---|---|---|---|
| 1 | Quantity and carton count | Counts every carton against the packing list | Major |
| 2 | Shipping marks and labels | Compares carton marks, barcode and age label with the signed artwork | Major |
| 3 | Carton condition | Checks for crushing, water marks and damaged corners | Major |
| 4 | Dimensions | Measures at least five pieces against the spec sheet and tolerance | Major |
| 5 | Surface finish and sanding | Feels and inspects edges, faces and holes; checks splinters and rough patches | Critical for sharp edges, major for rough finish |
| 6 | Paint and finish | Checks colour against the signed chip and tests adhesion by the agreed method | Major |
| 7 | Joints and assembly | Pulls or twists joints by the agreed method; checks for exposed fasteners | Critical if a fastener is exposed, major if a joint is loose |
| 8 | Small parts and age grading | Checks detachable parts on items sold for under three | Critical |
| 9 | Magnets, strings and hardware | Checks security and length of cords, and magnet retention | Critical |
| 10 | Moisture | Takes meter readings on a sample of boards, target roughly 8–12% | Major |
| 11 | Labelling and warnings | Checks age marking, warnings and batch code against the market rules | Major or critical depending on the market |
| 12 | Inner packing | Checks polybag, divider or inner box against the packing spec | Major |
Two checkpoint habits make the report usable. Measure against the signed spec sheet and sample, not against what the inspector remembers. Photograph every critical and major defect with the carton number visible, so the factory can trace the batch.
A copy-ready inspection plan template
Paste this into the PO or attach it as an annex. Replace every placeholder before the plan is issued.
``` PRE-SHIPMENT INSPECTION PLAN
Buyer: <company, contact> Supplier / factory: <legal name, workshop address> PO number: <number> Style(s) and SKU(s): <list, one per line> Order quantity per lot: <units> Inspection stage: after packing, before loading Inspection standard: ISO 2859-1, general inspection level II, single sampling, normal inspection AQL: critical: zero acceptance (any critical rejects the lot) major: 2.5 minor: 4.0 Lot / sample / Ac / Re: <from the table above, per style> Checkpoints: see annexed checkpoint list, items 1–12 Defect definitions: see annexed defect list, signed by buyer and supplier Sample selection: random across pallet positions and production dates Report must include: lot size, sample size, Ac/Re, defect counts by class, measurements, photographs, inspector name and date Disposition: accept / rework and re-inspect at supplier cost / reject Re-inspection: one round included; further rounds at supplier cost Booking: <inspector, date, 2–3 weeks ahead in peak season> ```
The defect list is the part that prevents disputes. Write it in plain language and send it to the factory before production, not to the inspector only.
| Class | Wooden toy examples | Rule |
|---|---|---|
| Critical | Sharp point or edge, detachable small part on an under-three item, accessible magnet, cord loop, exposed nail or screw | Any occurrence rejects the lot. |
| Major | Loose joint, paint flaking, wrong dimension outside tolerance, missing piece in a set, wrong label | Ac/Re from the table; at or above Re, the lot fails. |
| Minor | Cosmetic scuff, colour drift inside the agreed tolerance, print slightly off register, light glue mark | Ac/Re from the table; counted separately from majors. |
Before, during and after the inspection
- Agree the plan before the deposit. Attach the table, the checkpoints and the defect list to the PO. If the supplier will not sign the defect list, that is a finding.
- Book the inspector early. In August to November, book 2–3 weeks ahead; the inspection date should be after packing and before loading, not before packing.
- Pull the sample correctly. The inspector should take cartons from different pallet positions and production dates, not the cartons the factory has set aside. If a factory offers a pre-selected sample, choose different cartons.
- Inspect and count by class. Run the checkpoints, record measurements and count critical, major and minor defects separately. Photograph every defect with its carton number.
- Apply the disposition rule. At or below Ac, accept; at or above Re, reject and agree rework; any critical defect, reject. Write the decision on the report, not in a chat message.
- Re-inspect after rework. One re-inspection round is commonly included; agree in the plan who pays for further rounds and how a second failure is handled.
- Release the balance against the documents. Tie the balance payment to the inspection result and the shipping documents, so the plan has commercial weight.
- Keep the report with the shipment file. The next order's plan starts from this report and the defect history, not from a blank template.
What the report must contain, at minimum: lot and sample sizes, the code letter, the Ac/Re used, defect counts by class, the measurements taken, photographs of defects with carton numbers, the inspector's name and the date. A report without the lot and sample numbers cannot be checked against the plan.
How to use this with a supplier
- Send the checkpoint list and the defect list with the PO and ask for written acceptance before production starts.
- Tell the factory the inspection date as soon as it is booked. Unannounced inspections are allowed by the plan; surprise is a poor substitute for a clear rule.
- Keep the same plan across orders and change only the lot and sample lines. A stable plan is easier to audit than a new one each time.
- Treat a failed lot as a process question, not only a commercial one. Ask which checkpoint failed and what changed at that step.
- Record each report in the supplier file. Three clean reports are a better reason to relax the level than any sales claim.
The method behind inspection levels and inspector choice is on the inspection and AQL page; the wider supplier scorecard is the 58-point evaluation checklist. If you want the plan reviewed before the order, send the PO and the product spec with the quote request.
Matching stage: supplier evaluation. When the specification is fixed, request a quote.